The essentials. Renovated villa, Mandelieu-la-Napoule area (06). Workmanship defects across civil engineering and finishing works, recorded after completion of a renovation contract. Technical inspection conducted in English, benchmarking every defect against the French codes of practice (NF DTU). A 15-page report prepared the owners for the joint site meeting with the contractor.

Key data

Scope Full defects survey after completion of a renovation contract, ahead of a joint site meeting
Method Room-by-room and external-works inspection; every defect located, measured and photographed
Benchmark Each defect assessed against the applicable French codes of practice (NF DTU)
Findings Cracking in the external slab · gaps and misalignments indoors · corrosion and finishing defects outside
Deliverable 15-page report written in English, on the table at the joint site meeting

The context

The property is a villa that underwent a full renovation under a main contractor. After completion, the owners – an international couple – identified a series of defects: cracks in the external paved areas, gaps and misalignments indoors, corrosion and finishing defects outside. A dispute was emerging with the contractor over what was contractual and what was not.

The question posed

The owners needed three things: a complete, dated record of the defects; an assessment of each defect against the applicable French standards – the NF DTU codes of practice that govern how works must be executed in France; and a technical basis to raise the right points at the joint site meeting scheduled with the contractor.

How the inspection went

The survey covered the villa room by room and the external works: paved terraces, façades, guardrails, access hatches, joinery and locks. Every defect was located, measured and photographed. The aim was not opinion but benchmarking: for each observation, the inspection asked – what does the applicable code of practice require, and does this work comply?

Key findings

Cracking in the external slab

Crack running across the external concrete slab near the villa
A crack running across the external slab: located, measured, and assessed against the applicable earthworks and paving standards.
External slab crack - wider context
Wider context of the slab crack: joint layout, proximity to the structure.

Gaps and alignment defects

Gap between skirting and floor slab measured with a tape
The gap between skirting and slab is measured and recorded: small individually, these gaps add up to a pattern.

Finishing and durability defects

Access hatch in a masonry wall
Access hatches are checked for fit, fixing and weathertightness.
Lock keeper close-up - finishing defect
Locks and ironmongery: a typical finishing-trade defect, benchmarked against the hardware manufacturer specification.
Corroding external handrail
Corrosion already under way on external metalwork: durability of the works in a coastal environment.

Analysis and deliverable

The report classified every defect, identified probable causes, and set out – in English – what the French codes of practice require for each trade. For the owners, this turned a frustrating list of grievances into a structured technical position: what is clearly non-compliant, what is acceptable tolerance, and what deserves repair before retention monies are released. The report was on the table at the joint site meeting, in the owners’ own language.

What this case illustrates

International owners on the French Riviera face a double barrier when a renovation goes wrong: the language, and the French technical framework itself. An independent inspection conducted and reported in English, against the French NF DTU standards, removes both. See also our VEFA and new-build expertise or contact us to discuss your situation.

See also: damp converted basement – Villeneuve-Loubet · widespread mould in a flat – Antibes

Does your situation look like this case?

Every case is different. Describe yours: an independent building expert replies within 24 hours, with no obligation. A first consultation by video call is available.

Discuss my situation
Video consultation

Names, address and sensitive data anonymised; photo metadata removed. Provided for illustrative purposes only; not advice for your own situation.

📅 Last updated 02/11/2026 - Cassini Expertise, independent building expert – departments 06, 83 and 13.

💳 First expert opinion: €45