Delivery Delays

In Nice, Marseille, Cannes and Antibes, VEFA delays are common. A building expert can assess actual progress against the contractual schedule, evaluate technical causes and attend the handover.
Hidden Defects in New Builds
- Cracks from clay shrink-swell (very common in the Var and the Alpes-Maritimes)
- Waterproofing failures on terraces and flat roofs
- Incorrect surface area (Carrez law, habitable surface)
- Water infiltration from poor window installation
- Insulation defects (thermal and acoustic)
The Handover Report: Key Step
A building expert prepares a detailed defects report with photographs and measurements, which you can then use with the developer.
Forum Questions Answered
“My Nice developer is 6 months late” : contractual penalties apply (often based on the 1/3000th-per-day benchmark taken from the CCMI, the French contract for building a single-family home). Get an expert report to support a claim for damages.
“Cracks appeared 2 years after handover” : the ten-year builder’s warranty covers structural defects. An expert can establish whether the building is affected.
“The Carrez area doesn’t match” : if the difference exceeds 5%, the price is reduced proportionally. A surveyor can measure it precisely.
Structural Cracks: What Buyers Need to Verify
Beyond simple cosmetic cracking, the key question is always whether a crack is stable, cyclical or progressive. On the Côte d’Azur, clay-rich soils (RGA, clay shrink-swell, from the French retrait-gonflement des argiles) mean seasonal ground movement is common, and even new-build properties are not immune if foundations were undersized for the local soil profile. A crack gauge (fissuromètre) installed for a few months across a full dry/wet cycle gives objective, measurable data rather than a one-off visual opinion, and this is usually far more persuasive to a developer or their insurer than photographs alone.
VEFA Snagging (Réserves): Getting It Right at Handover
Under French law, defects noted at handover (snagging items, or réserves) must be formally listed in the handover report (procès-verbal de livraison) to preserve your rights under the garantie de parfait achèvement (the one-year warranty covering all reported defects). Defects discovered later can still fall under the ten-year builder’s warranty (garantie décennale) or the two-year equipment warranty (garantie biennale), but the burden of proof becomes heavier. An independent building expert attending the handover, rather than relying solely on the developer’s own checklist, significantly reduces the risk of overlooked defects.
Working With a Bilingual Expert
Many overseas buyers on the French Riviera are unfamiliar with the French legal framework around construction (the Civil Code and the Construction and Housing Code) and the practical steps in a dispute: formal notice letters (mises en demeure), applications for a court-appointed expert assessment before the tribunal judiciaire (référé expertise), and the role of a dire (a written submission to the court expert) prepared jointly with a lawyer. Cassini Expertise provides clear, bilingual reports (English/French) that your solicitor or French lawyer (avocat) can use directly, setting out technical findings in terms that make sense in both legal systems.
Frequently Asked Questions
How long do I have to claim for a VEFA defect? One year from handover for defects noted as snags (garantie de parfait achèvement); up to ten years for defects affecting the structure or making the property unfit for its purpose (garantie décennale).
Can I withhold part of the final payment over unresolved defects? In some circumstances a portion of the price can be held in escrow (consignation) until defects are fixed. This should be discussed with your notary (notaire) and solicitor before signing.
Cassini Expertise operates in the Alpes-Maritimes and the Var on all off-plan (VEFA) disputes.
Further reading:
Frequently asked questions
What is VEFA in France?
VEFA (vente en l’état futur d’achèvement) is a French contract for buying property off-plan. The buyer pays in stages as construction advances, and ownership transfers upon completion. It is common for new builds and comes with payment schedules and legal protections.
What are common defects in VEFA properties?
Common defects include poor finishes, waterproofing issues, electrical or plumbing problems, and structural cracks. Buyers have a ten-year builder’s warranty and a one-year completion warranty to address these. A professional inspection before handover is crucial to document the issues.
What happens if VEFA delivery is delayed?
If delivery is delayed beyond the contract date, you may claim penalties (typically 1/3000 of the price per day) unless the delay is due to force majeure. You can also request compensation for additional costs. Legal action is possible if the delay is significant, but take legal advice first.
See also: VEFA on the French Riviera: Delays, Hidden Defects, Construction Faults
Survey carried out by Frédéric Faucouneau, independent building expert, Antibes, Alpes-Maritimes (06), Var (83), Bouches-du-Rhône (13). Last updated: 23 November 2026. Find out more
Last updated 23 November 2026 - Cassini Expertise, independent building expert, departments 06, 83 and 13.