In short. In Cannes, VEFA handover assistance from Cassini Expertise, an independent building expert, starts at €545 incl. VAT (illustrated snagging report handed over on site) or €745 incl. VAT (technical report and snagging letter to the developer), travel included. VEFA means vente en l’état futur d’achèvement, an off-plan purchase. We review the contract, the technical specification (CCTP) and the plans, record the snagging items (réserves) on handover day and check afterwards that they have been put right. We cover the 06, 83 and 13.
In Cannes, off-plan purchases are often in high-end residences, where the finish expected (marble, made-to-measure joinery, home automation) is also where gaps between the technical specification and the delivered flat can matter most. At that level of value, even a small non-conformity can be significant. We record the finishes and fittings with you on site, compare them with the contract documents and provide technical support to your lawyer if the matter goes further.
How our VEFA survey works
We follow the timetable of your purchase. Beforehand, we review the VEFA contract, the CCTP and the plans to prepare a checklist. On handover day, our expert is on site: he or she goes through the home with you, measures, photographs and helps you word the snagging items in the handover report. The decision to sign, and with which reservations, stays with you. In the year that follows, we check whether the snagging items have actually been put right, in line with the statutory completion warranty (garantie de parfait achèvement, article 1792-6 of the Civil Code). If the developer does not act, the file can move to a contradictory expert assessment or be handed to your lawyer as technical support.
How much does a VEFA expert cost in Cannes?
In Cannes, handover assistance has published prices: from €545 incl. VAT (illustrated snagging report handed over on site) or €745 incl. VAT (technical report plus a snagging letter ready to send to the developer), travel included; see our full fee schedule. Other assignments (follow-up of snagging items, disputes) are quoted precisely and free of charge within 24 working hours. In a dispute, whether the cost of an expert can be claimed back from the developer is a matter for your lawyer and, ultimately, for the court.
Remedies and disputes in VEFA
If an amicable solution fails, a dispute may be taken to the court of Grasse (tribunal judiciaire), with the Aix-en-Provence Court of Appeal hearing appeals. Our reports are written so that they can be used in proceedings: dated findings, measurements and a clear technical description of each defect. We work regularly with lawyers, including on written submissions to the court-appointed expert (dires). We are not court-appointed experts: we assist the parties and their lawyers.
Taking delivery of a new home in Cannes: projects and local context
Urban development projects publicly documented in Cannes:
- Nouvelle Frayère (La Frayère district, in La Bocca): an urban renewal project that has been in its operational phase since the agreement signed with the national urban renewal agency (ANRU) in autumn 2019, with public facilities, refurbishments and new buildings, including housing. The file also mentions flood-risk reduction works along the Frayère stream.
The floods of 3 October 2015 in Cannes are a reminder to read the risk statement (état des risques) supplied with the reservation contract. Cannes is a coastal commune and is therefore subject to France’s coastal protection law (loi Littoral).
Construction disputes are in principle heard by the tribunal judiciaire of Grasse, with the Aix-en-Provence Court of Appeal above it. Which court is competent depends on the address of the property and the clauses of your contract, and your lawyer will confirm it.
Public information consulted on 20 November 2026, presented as planned or announced where the source does not confirm delivery. Sources (in French): presentation notice, Nouvelle Frayère (prefecture), Cannes, Wikipedia.
Typical VEFA issues in Cannes
Issues that can arise in new-build purchases in Cannes include a sea view blocked by a structure not shown on the site plan, materials substituted without the buyer’s agreement, and communal swimming pools delivered later than the private areas or with defects. See, for example, our case study on a view obstructed by a non-compliant slope in Cannes and our article on delayed delivery in Cannes-la-Bocca.
Related pages:
VEFA in Cannes: frequently asked questions
Floor area smaller than on the plans: what are your options?
French Civil Code articles 1616 to 1622 deal with a shortfall in the area stated in a sale contract. Under article 1619, a price reduction is only due if the difference between the real and the stated area is more than one twentieth (5%), unless the contract provides otherwise, and article 1622 says that a claim for a price reduction or for cancellation must be brought within one year of the date of the contract. How these rules apply to your VEFA contract is a legal question for your lawyer. An independent measurement of the area gives your lawyer a technical basis to work from.
What if the developer refuses to clear the snagging items?
A common first step is a registered letter to the developer listing the items still outstanding. If that does not work, your lawyer can advise on the options, such as a contradictory expert assessment (where both sides are present), mediation or court proceedings. The one-year statutory completion warranty (garantie de parfait achèvement, article 1792-6 of the Civil Code) covers the defects recorded at handover, and the apparent defects you recorded are also covered by articles 1642-1 and 1648.
Does the developer pay for the VEFA expert?
Not automatically. In some disputes, the cost of a private expert report can be claimed as part of the damages or legal costs, but it is for the court to decide whether and how much to award, and it depends on the outcome of the case. Your lawyer can tell you whether this is realistic in your situation.
Which snagging items should you note at handover of a new home?
All the ones that are visible on the day: cracks, finishing defects, equipment that does not work, items that differ from the technical specification (CCTP), waterproofing and acoustic problems. Hidden defects that could not be detected at handover fall under the two-year functioning warranty (article 1792-3 of the Civil Code) or the ten-year builder’s warranty (article 1792), and should be notified in writing as soon as they are discovered.
Your VEFA expert in Cannes
Cassini Expertise, an independent building expert, assists off-plan buyers in Cannes and throughout the 06 area: handover preparation, snagging report, follow-up of snagging items and technical reports for disputes. To go further, see our page on VEFA in the 06, 83 and 13: defects, delays and hidden issues. For the legal side, your lawyer is the right person to advise you.
VEFA handover assistance in Cannes: from €545 incl. VAT, travel included. See the full fee schedule.
VEFA expert in Cannes: Cassini Expertise, +33 4 22 46 06 04. Free quote within 24 working hours.
See also: Building Expert in Antibes: Cracks, Damp, Off-Plan Defects
Last updated 27 November 2026 - Cassini Expertise, independent building expert, departments 06, 83 and 13.