In short. A party wall belongs to both neighbours: repairs are shared in proportion to each owner’s rights, unless one of them caused the damage. If the neighbour refuses, do not carry out the work alone before the defect has been recorded and the neighbour informed in writing: a survey, quotes and an attempt at agreement are the three pillars of the file.
Your situation in brief
The wall between two properties is cracking, leaning, crumbling or letting water through. You want to repair or rebuild it, and your neighbour refuses to pay, does not reply or disputes the cause. Sometimes the dispute is about something else: a structure resting on the wall, a raising of its height, roots, spilling render.
In every case, the first question is whether the wall really is a party wall (mur mitoyen), and what you can do without the other owner’s agreement.
The first five steps
- Check that it is a party wall: title deeds, plans, land registry, outward signs. Failing a title or a contrary mark, a dividing wall is presumed to be a party wall (article 653 of the French Civil Code).
- Have the condition of the wall recorded: dated photographs, survey of the cracks, plumb, signs of damp, probable cause (earth pressure, roots, foundations, overload, poor maintenance).
- Inform the neighbour in writing: description of the defect, any danger, proposal for shared quotes, time to reply.
- Obtain two comparable quotes and propose a proportionate sharing of the cost.
- Try conciliation (a court conciliator, free of charge) before going further: an attempt at an amicable settlement is required before going to court in many neighbour disputes.
What to avoid
- Demolishing or rebuilding the wall without warning: you could be held liable for the harm caused.
- Drilling, embedding or resting a structure on the wall without the neighbour’s agreement or a prior expert assessment (article 662 of the Civil Code).
- Raising the wall without checking its strength: the right to build higher exists, but at your cost, with possible compensation, and rebuilding the wall if it is too weak (article 658 of the Civil Code).
- Settling the dispute through a string of informal messages, with no clear written record or survey.
What the law says, in plain terms
Repair and reconstruction of a party wall are borne by all those who have rights in it, in proportion to each person’s right (article 655 of the Civil Code). A co-owner of the wall can free himself of that obligation by giving up his party-wall right (article 656), unless the wall supports a building that belongs to him.
If the damage is caused by one of the neighbours – works, planting, overload – that neighbour must answer for it. Hence the importance of the technical cause, which determines how the cost is shared.
How we help
We draw up a technical survey of the wall: record of the defects, plumb, nature and condition of the masonry, visible foundations, hypotheses on the cause (earth pressure, roots, damp, overload, neighbouring works), then we specify the repair works and their cost.
That report is the basis for talks with the neighbour, for a shared quote or for a joint amicable expert assessment. We can also accompany you at the on-site meeting with the neighbour. We do not sell building work: our opinion is independent.
Frequently asked questions
Who pays to repair a party wall?
All the owners of the wall, in proportion to their rights, unless the damage is attributable to one of them. Have the cause established before discussing how to share the cost.
My neighbour refuses to pay: can I do the work alone?
Sometimes, but it is risky: without agreement or a decision, you will then have to prove the work was necessary and claim your neighbour’s share. Have the defect recorded, inform your neighbour in writing and keep the quotes before acting.
Can I get rid of the party wall?
By giving up your party-wall right (article 656), you can free yourself of the obligation to repair or rebuild, unless the wall supports a structure that belongs to you. The abandonment has lasting effects: take advice first.
Further reading
- Party wall: shared repair and maintenance between neighbours
- Party wall built higher unilaterally: what to do
- Party walls and easements in the Alpes-Maritimes: a guide
Other situations
- Your Insurer Limits Its Cover: What You Can Do
Insurer refusing, reducing or capping your claim? Dommages-ouvrage, natural disaster and home insurance: your options and how an expert helps. - Amicable Expert Assessment: Avoiding a Costly Court Expert
A court-appointed expert costs money and takes months. An agreed amicable expert assessment: when it is enough, how to set it up and its limits. - Cracked or Falling Facade: Who Is Liable?
Widening cracks, render or stones falling: builder, owner, managing agent, neighbour? Safety first, then evidence and your options, step by step. - New-Build (VEFA) Delivery: Pre-Handover or Handover?
Buying off-plan (VEFA): what is the pre-handover visit for, when do you sign the handover, how to record snags and what to do about the balance. - Work Paid For but Not Accepted: Contractor Wants the Balance
Building work almost fully paid, no acceptance signed, and the contractor claims the balance? Acceptance, snags, retention: the right first steps.
Does this sound like your situation?
Tell us about your case: free quote within 24 hours, independent expert, no building company behind us. English spoken.
First video consultation: terms and conditions
General information, up to date as of 14 November 2026. It does not replace legal advice or a review of your documents.
Last updated 13 November 2026 - Cassini Expertise, independent building expert, departments 06, 83 and 13.