A house perched in the hillside hinterland, a private track, and two neighbouring households who have been arguing for years over the same question: how wide must the track be? The case, now before a court of appeal, illustrates every classic pitfall of rights of way in our hillside towns. Here it is, anonymised.
The starting point: a century-old title
The house benefits from a right of way created a long time ago, a very long time ago. The judge who fixed its course sat more than a century ago, in the civil court. The later deeds (partition, sale, a recently published certificate) all say the same thing: a passage about two metres wide. The neighbour, for their part, claims a width of 3.50 metres, based on local custom and recent planning documents.
Two metres or three and a half: a battle of documents
The expert assignment consisted of going back through the whole chain of documents: notarial deeds registered at the land registry, mid-20th-century survey plans, the old judgment, a geotechnical report and a court-appointed expert report. Each document was checked against the ground: where the track really runs, where the walls are, which structures were built along its edge and with what permissions.
The second front: the building permit obtained by the other side. The full file was consulted at the town hall: opinion of the fire service (SDIS), opinion of the Architecte des Bâtiments de France (the government heritage architect), rules of the local development plan (PLU) and of the risk prevention plan. A striking result: neither the PLU nor the wildfire risk prevention plan (PPRIF) sets a minimum width for an existing access. The argument for a “regulatory 3.50 metres” falls apart when checked against the documents.
What this case teaches
- A right of way is read first in the title deeds, not in habit or wishful thinking: the chain of deeds prevails;
- Planning documents confirm or undermine the other side’s arguments : an SDIS opinion “not applicable”, or the absence of a width rule in the PLU, can be checked on file at the town hall;
- The ground must confirm the paper: walls, structures, works declarations and records are all cross-checked;
- On appeal, the expert report is the backbone of the submissions: it feeds directly into the lawyer’s pleadings.
In this case, the expert and the lawyer work together: the technical report tests each opposing argument, and the lawyer turns its conclusions into arguments before the court. That pairing is what makes the difference between a defence that is endured and one that is built.
A right-of-way dispute with your neighbour?
Before going to court, you need to measure, read the title deeds and check the authorisations. Our firm works across the département (Antibes, Cannes, Grasse and the hinterland) and alongside lawyers in court proceedings. Free quote, written findings within 48 hours of the visit: call +33 4 22 46 06 04 or contact us.
Further reading:
Survey carried out by Frédéric Faucouneau, independent building expert, Antibes, Alpes-Maritimes (06), Var (83), Bouches-du-Rhône (13). Last updated: 23 November 2026. Find out more
Last updated 23 November 2026 - Cassini Expertise, independent building expert, departments 06, 83 and 13.