{“@context”: “https://schema.org”, “@type”: “FAQPage”, “mainEntity”: [{“@type”: “Question”, “name”: “I’m receiving my VEFA handover next week and I’ve spotted defects – what should I do?”, “acceptedAnswer”: {“@type”: “Answer”, “text”: “Do NOT sign the handover report without noting reservations. List every defect in writing, with photographs. If a defect is visible, it must be recorded as a reservation. An expert can attend the handover with you to identify what you might otherwise miss.”}}, {“@type”: “Question”, “name”: “The developer refuses to resolve the reservations – what deadline applies?”, “acceptedAnswer”: {“@type”: “Answer”, “text”: “The developer has a contractually set deadline (typically 12 months) to resolve the reservations. If they fail to do so, you can bring the matter before the court and request a court-supervised expert assessment. Keep every piece of written evidence.”}}, {“@type”: “Question”, “name”: “Can I withhold part of the payment if the work is defective?”, “acceptedAnswer”: {“@type”: “Answer”, “text”: “Yes. As long as the work is not compliant, you can place the balance in escrow or withhold it outright. Never pay the full balance if defects remain – payment is treated as implicit acceptance.”}}, {“@type”: “Question”, “name”: “Can an expert attend the VEFA handover with me?”, “acceptedAnswer”: {“@type”: “Answer”, “text”: “Yes. An expert attending the handover with you identifies defects you might not notice, measures them precisely (crack monitor, laser level, moisture meter) and drafts reservations that are enforceable against the developer. Handover is the best moment to document everything.”}}]}
Delivery of a VEFA Parking Space: Technical Findings and Legal Stakes

When taking delivery of a new apartment purchased off-plan (VEFA – vente en l’état futur d’achèvement), the buyer signs the handover report after checking that the property complies with the reservation contract and the notarial deed. The parking space, usually located in the basement, is one of the annexes handed over. It is not uncommon, however, for the actual usable surface to fall short of the contractual or regulatory dimensions.
This page sets out the expert methodology used to establish such non-compliance, the applicable legal framework, and the procedure before the Nice judicial court to obtain redress.
Contractual Dimensions, Local Planning Rules and Standards: What You Need to Check
The Contractual Dimensions
The reservation contract and the notarial deed of sale specify the characteristics of the parking space (length, width, surface area). These contractual terms constitute a binding obligation on the seller under Article 1103 of the French Civil Code. Any discrepancy between the promised and the delivered surface engages the developer’s contractual liability under Article 1231-1 of the Civil Code.
Requirements of the Nice Local Urban Plan (PLU)
The Nice PLU – the planning regulation binding on new construction – sets minimum requirements for parking spaces depending on the zoning. As a general rule, the zoning regulations impose minimum dimensions for parking spaces depending on the zone concerned. Failure to comply means the completed structure does not conform to the building permit.
Cadastral Surface Versus Usable Surface
A distinction must be drawn between the cadastral surface (measured to the centre line of walls or partitions) and the usable surface, which is the only figure relevant to actual use. Columns, pipework, partitions or technical boxing all reduce the practical space available. The expert assessment measures the free width and length – that is, the space between fixed obstacles – in order to determine the surface that can genuinely be used.
The Expert Methodology Applied by Cassini Expertise
Joint On-Site Survey
The expert attends the site with a laser distance meter and a double tape measure and records:
- the free width between columns, partitions or side walls;
- the free length between the rear wall and the projection of any obstacle (utility box, pipework);
- the footprint of the ground markings and how it corresponds to the usable space;
- the clearance width on both the driver’s and passenger’s side.
These measurements are recorded on a dimensioned sketch and photographed. The findings report establishes a joint record of the site as observed.
Comparison Against Contractual Terms and the PLU
The report cross-checks the measured dimensions against the contract documents (notarial deed, descriptive notice, reservation plan) and the PLU requirements. Where a discrepancy is found, the expert characterises the non-compliance and quantifies its consequences (loss of value, inability to use the space normally).
Statutory Warranties Applicable to VEFA Purchases
One-Year Warranty of Perfect Completion (Article 1792-6 of the Civil Code)
This warranty covers, for one year from handover, any defect reported by the buyer, whether or not it was noted as a reservation on the handover report. A parking space with dimensions smaller than contracted may fall under this warranty if identified within that year.
Two-Year Warranty (Article 1792-3 of the Civil Code)
This covers, for two years from handover, detachable fittings and equipment (doors, windows, pipework). It generally does not apply to structural elements (columns, slabs), unless the defect affects a detachable fitting.
Warranty Against Hidden Defects (Blog 1641 et seq. of the Civil Code)
The buyer may invoke the warranty against hidden defects within two years of discovering the defect (Article 1648, first paragraph). A defect is considered hidden if it was not apparent at handover. A dimensional non-compliance may qualify as a hidden defect if it could not be detected without precise measurement.
General Contractual Liability
Independently of the statutory warranties, the developer is bound to perform its contractual obligation: to deliver a parking space that matches the terms of the contract (Article 1103 of the Civil Code). Breach of this obligation engages the developer’s liability under Article 1231-1, subject only to the general five-year limitation period (Article 2224 of the Civil Code).
Amicable Procedure: Formal Notice to the Developer
Drafting and Sending a Registered Letter With Acknowledgement of Receipt
The buyer sends the developer a registered letter with acknowledgement of receipt setting out:
- the contractual terms (promised dimensions);
- the measurements recorded on site;
- the legal basis for the claim (warranty of perfect completion or contractual liability);
- the request for remedial works or a price reduction.
This formal notice must be precise, quantified, and accompanied by a measurement report.
Response Time and Negotiation
The developer has a reasonable period (typically one month) to respond. They may propose remedial works (relocating partitions, adjusting the ground markings), a lump-sum indemnity, or a price reduction proportional to the missing surface area.
Court Proceedings Before the Nice Judicial Court
Territorial Jurisdiction
For a property located in Nice, the Nice judicial court has territorial jurisdiction (Article 42 of the Code of Civil Procedure). For a property located in Antibes, Cannes, Grasse or Mougins, jurisdiction lies with the Grasse judicial court.
Action for Specific Performance or Price Reduction
The buyer may seek:
- performance in kind (remedial works), where materially possible;
- a price reduction proportional to the missing surface area, calculated by reference to the price per square metre of parking within the same development;
- damages for loss of enjoyment or loss of market value.
Judicial Expert Assessment
The judge may order a court-supervised expert assessment to jointly measure the dimensions of the parking space, compare them against the contractual terms and the PLU, and evaluate the resulting loss. The court-appointed expert submits a report to the court, which then rules on the claim.
Consequences on Resale
A non-compliant parking space affects the market value of the apartment. A subsequent buyer can have the space measured before signing the notarial deed and negotiate a price reduction or withdraw from the sale. The original seller must then either agree to a price reduction or fund remedial works. Failure to regularise the situation may lead to the sale being annulled for defect of consent (mistake as to essential qualities) or to the seller’s liability being engaged under the warranty against hidden defects.
Precautions to Take at Handover
- Bring a tape measure or laser distance meter on the day of handover.
- Systematically measure the free width and length of the parking space.
- Compare the measurements against the contractual dimensions and the PLU.
- Record written reservations on the handover report if any discrepancy is found.
- Ask an expert to intervene before final signature if any doubt remains.
The Role of Cassini Expertise in Establishing the Facts and Assessing the Loss
The building expert intervenes at handover or during a dispute to:
- carry out a joint measurement survey of the parking space;
- analyse the contractual terms and the PLU requirements;
- draft a quantified technical report to support the formal notice or court summons;
- assist the buyer during any subsequent court-supervised expert assessment.
This work is carried out at the request of the buyer or their legal counsel, in full compliance with the adversarial principle and in complete independence.
See also: Non-Compliant Parking Space in a VEFA Sale in Nice · Basement Parking Damp in a New Build, Nice West: Snags · Undersized VEFA Parking Space in Nice: What Are Your Rights?
📅 Updated on 27/08/2026 – By Cassini Expertise, independent building expert covering the 06, 83 & 13 departments. Free quote: 04 22 46 06 04.
{“@context”:”https://schema.org”,”@type”:”ProfessionalService”,”name”:”Cassini Expertise – Independent Building Expert”,”telephone”:”+33422460604″,”email”:”contact@cassini-expertise.fr”,”address”:{“@type”:”PostalAddress”,”streetAddress”:”22 rue Vauban”,”addressLocality”:”Antibes”,”postalCode”:”06600″,”addressCountry”:”FR”},”areaServed”:[“Alpes-Maritimes”,”Var”,”Bouches-du-Rhône”],”description”:”Independent building expert: damp, drought-related clay shrinkage (RGA), cracks, off-plan (VEFA) defects, workmanship defects, odours, structural diagnosis. Detailed written report, no works sold, works alongside lawyers.”}
Survey carried out by Frédéric Faucouneau, independent building expert – Antibes, Alpes-Maritimes (06), Var (83), Bouches-du-Rhône (13). Find out more
📅 Last updated 06/11/2026 - Cassini Expertise, independent building expert – departments 06, 83 and 13.