# Buying a House in France Without a Survey: What the Sale File Does Not Show

> Crawl space, radon, repairs with no ten-year insurance, PPRIF red zone, compliance certificate: what the sale file does not show, and 10 checks before signing.

- URL : https://cassini-expertise.fr/en/buying-a-house-in-france-without-a-survey-hidden-risks-red-zone-compliance-radon/
- Langue : en-US
- Mis à jour : 2026-11-23
- Site : Cassini Expertise (https://cassini-expertise.fr/)

By Cassini Expertise – Independent building expert · Menton, Nice, Antibes, Cannes, Toulon · [+33 4 22 46 06 04](tel:+33422460604)

**Related: [French diagnostics versus a building survey](https://cassini-expertise.fr/en/french-property-diagnostics-vs-building-survey/).**

**In short.** A French house sale file contains the mandatory diagnostics. It says nothing about the ventilation of a crawl space, the quality of the works the seller says were done, radon outside zone 3, or, in practice, how the house was built compared with its permit and the rules of its zone: the red zone of a natural-risk prevention plan (flood, forest fire), a missing compliance certificate. Buying without a survey may mean taking on those risks without knowing. In two of our cases, the house lay in the red zone of a PPRIF (forest-fire risk prevention plan) with no compliance certificate, and the buyers withdrew. Here is what real cases show, and the checks to make before signing.

## What the sale file covers, and what it does not

The diagnostic file given to the buyer includes compulsory diagnostics depending on the property: asbestos, lead, termites, gas, electricity, energy performance, non-mains sewage, and the risks and pollution statement (ERP). They answer specific questions. They do not answer these:

- the condition of the structure and whether cracks are evolving;
- hidden damp, ventilation, the origin of water ingress;
- the quality and guarantee of the works the seller announces;
- radon, which a sale file only has to mention for municipalities in zone 3;
- whether what was built complies with the permit and the zone’s rules.

## Two recent cases, two moments

|  | Before the purchase | A year after the purchase |
| --- | --- | --- |
| Who | A buyer, preliminary contract not signed | An owner with young children |
| Property | Terraced house over a crawl space, in a radon potential zone 2 municipality | Detached house over a crawl space, in a radon potential zone 2 municipality |
| What the survey shows | Crawl space with no ventilation at all, water not controlled, repairs with no invoice and no ten-year insurance | Saturated crawl space, drains on makeshift supports, roof water at the foot of the façades, three breaches of the DTU standards |
| What it changes | The buyer can negotiate, make the contract conditional, or walk away | The owner must measure radon, preserve the evidence and take advice, without having had the chance to negotiate |
| Case study | [Read the case](https://cassini-expertise.fr/en/pre-purchase-survey-house-crawl-space-radon-seller-repairs-case-study/) | [Read the case](https://cassini-expertise.fr/en/house-bought-year-ago-unventilated-crawl-space-damp-case-study/) |

In both cases, what matters appears in no diagnostic: missing ventilation, poorly managed water, unmeasured radon, works with no paperwork. The difference is when you look: before signing, you can negotiate; afterwards, you have to cope.

## The risk nobody imagines: a prevention-plan red zone and compliance

A house can be viewed, look appealing, have been “recently renovated”, and lie within a natural-risk prevention plan (flood, forest fire, ground movement), sometimes in the red zone, without that being visible from the living room. Buying without a survey may mean buying a house in the red zone of a natural-risk prevention plan (PPRIF, PPRI), with a building, an extension or a converted basement for which nobody showed you the compliance certificate. Three checks that you can make yourself, without an expert, help you avoid an unpleasant surprise.

### Two cases where the buyers walked away

This is not theoretical. In two of our recent cases, before purchase ([the house in Valdrane](https://cassini-expertise.fr/en/pre-purchase-survey-house-crawl-space-radon-seller-repairs-case-study/), with its unventilated crawl space, and [the villa in Rocamare](https://cassini-expertise.fr/en/sloping-plot-house-cracks-converted-basement-damp-pre-purchase-case-study/), with its converted basement), the property lay in the red zone of a PPRIF (forest-fire risk prevention plan), with no compliance certificate. A red zone is in principle unbuildable, and without a compliance certificate it is hard to show that a building was “lawfully built”, the condition for rebuilding “as it was” under Article L. 111-15 of the Urban Planning Code, which also lets the natural-risk prevention plan provide otherwise. Destroyed or demolished, the house might no longer be rebuildable. To our knowledge, nobody had pointed this out to the buyers, who withdrew.

### 1. Know which zone the plot is in

The risks and pollution statement attached to the sale file says whether the property lies within a natural-risk prevention plan; it can be cross-checked on the Géorisques website. A red zone corresponds to the highest hazard or to areas to be preserved; it is in principle unbuildable, but only the regulations of the approved plan, available at the town hall, say what remains allowed on existing buildings (limited extension, alterations, change of use).

### 2. Ask for proof of compliance

A building or extension authorised by a permit leads, on completion, to a declaration certifying completion and compliance of the works (DAACT). From its receipt by the town hall, the competent authority has three months to challenge compliance, and five months where an on-site check (récolement) is compulsory (Article R. 462-6 of the Urban Planning Code). The check is in fact compulsory for works carried out in an area covered by a foreseeable natural-risk prevention plan, unless the plan imposes only seismic or cyclone standards or a preliminary study of the ground’s suitability (Article R. 462-7). If the authority has not challenged within the time limit, it must issue, on request from the permit holder or their successors in title, a certificate stating that compliance was not challenged, within fifteen days (Article R. 462-10). This certificate is not an absolute guarantee, but its absence should raise questions.

### 3. Question your insurer before signing

Natural-disaster cover in principle applies to property covered by a damage insurance policy, but the Insurance Code allows the insurer to refuse it in certain cases, for example for some buildings built in breach of prevention rules (Article L. 125-6; check the version in force). Asking the insurer what it will accept for this specific property, before signing, avoids finding out after a loss.

### An example: the converted basement nobody shows the paperwork for

In a third recent case, before purchase, a villa of about 210 m² on wooded sloping ground, classed in a natural and forest zone of the local plan and covered by a forest-fire risk prevention plan, included a former crawl space converted into habitable rooms. The seller had supplied no permit, no plans and no ground study, and the date and conditions of the conversion were unknown. The survey found walls saturated up to about 90 cm high; for lack of documents, it could not say whether the conversion had been authorised or compliant. The property also lay in the red zone of a PPRIF, with no compliance certificate: the same mechanism, what was built or converted with nobody showing the paperwork. See [the case study](https://cassini-expertise.fr/sloping-plot-house-cracks-converted-basement-damp-pre-purchase-case-study/).

## What a pre-purchase expert does, and does not do

An independent expert goes on site before you commit and records what can be seen and measured: condition of the ground floor, damp, ventilation, water management, cracks, added structures. In the two cases above, the expert:

- recorded air temperature and humidity and calculated the dew point;
- characterised each defect (nature, probable cause, severity, whether it is evolving);
- listed the missing documents (invoices, ten-year insurance, rainwater plan);
- gave the list of points to clear before committing.

The expert carries out no regulatory compliance audit, no valuation and no legal advice, and does not prescribe works. That said, spotting on site a converted basement, a recent extension or flood marks, and then saying which documents to ask for, changes the conversation with the notary and the seller.

## Ten checks before signing

1. Read the risks and pollution statement, then cross-check it on Géorisques.
2. If the plot is in a regulated zone of a prevention plan: read the plan’s regulations at the town hall.
3. Ask for the permit and the compliance-not-challenged certificate for everything built or extended.
4. Ask for invoices, description and ten-year insurance certificate for the works the seller announces.
5. Check the crawl-space ventilation and the state of the ground under the floor.
6. Look at where rainwater goes: gutters, downpipes, manholes.
7. Have radon measured if the municipality is in zone 2 or 3, or if the ground floor sits over a non-ventilated crawl space.
8. Have the cracks examined: width, direction, evolution.
9. Ask your insurer whether it will accept the property.
10. Have it surveyed before the preliminary contract, or make the contract conditional on the results.

## Frequently asked questions

### Can a buyer ask the seller for proof that the house complies with its planning permit?

Yes, and it is a useful check. The owner (or their successors in title) can ask the town hall, where it has not challenged compliance within three months (five months if an on-site check was compulsory), for a certificate stating that compliance was not challenged, issued within fifteen days (Article R. 462-10 of the French Urban Planning Code). The notary can help gather the documents.

### Can you buy an existing house in the red zone of a natural-risk prevention plan (flood, forest fire…)?

The approved plan’s regulations say what remains allowed: a red zone is in principle unbuildable, but the regulations may permit limited work on existing buildings. What matters for a buyer is to read the regulations of the plan that applies to the plot, check what the building is allowed to become, and question their insurer before signing.

### Does a building expert carry out a regulatory compliance audit?

No. We do not carry out regulatory compliance audits, valuations or legal advice. We record, measure and characterise what can be seen and measured, and we list the documents and checks to request before committing: this is what allows the buyer and their notary to ask the right questions.

### When should the survey be done: before the offer, before the preliminary contract?

Before the binding commitment, so before the preliminary contract (compromis) or, failing that, within the cooling-off period or while conditions precedent apply. A survey can be arranged in a few days; the visit takes place with the seller or the agent present. The documents requested (invoices, ten-year insurance, plans) should be asked for at the visit.

## Further reading

- [Case study: the pre-purchase survey with crawl space, radon and the seller’s repairs](https://cassini-expertise.fr/en/pre-purchase-survey-house-crawl-space-radon-seller-repairs-case-study/)
- [Case study: the house bought without a survey](https://cassini-expertise.fr/en/house-bought-year-ago-unventilated-crawl-space-damp-case-study/)
- [Case study: comparing two properties before signing](https://cassini-expertise.fr/en/second-home-pre-purchase-survey-comparing-two-properties-case-study/)
- Price of a building survey

## Viewing a house? Have it looked at before you sign.

Free quote within 24 hours, independent expert, no building company behind us. We record, we measure, we list what to ask the seller. We speak English.

[Contact us](https://cassini-expertise.fr/en/contact/) [+33 4 22 46 06 04](tel:+33422460604)

*General information, up to date as of 23 November 2026. The Urban Planning Code articles cited were read in an up-to-date copy of the code (November 2026); check the version applicable to your case with your notary.*

---